Amadeus API       

Node
PoweredPNR_AddMultiElements
pnrActions



Description

To specify specific Actions to be processed on PNR.
Status (Requirement Designator) = Mandatory. Repetition = 1.

XML Tree

<pnrActions>
     <optionCode></optionCode>
</pnrActions>


Field Descriptions

Field Attributes and Description
Mandatory  optionCode Field Type = Data Element.
Numeric, minlen=1, maxlen=5, repetition=40.

0 No Special Processing 10 - 49 PNR processing options 50 - 99 PNRACC options 100 - 149 Other Opt 150 - 199 Error Processing 200 - 229 Car Opt 230 - 259 Hotel Opt 260 - 299 Air + AUX Opt 300 - 329 Ticketing Opt.
For a list of valid codes, see codeset optionCode.

Naming Conventions

minlen = Minimum Length,
maxlen = Maximum Length,
Mandatory = Mandatory,
Node = Node,
Repetition = Maximum number of occurences for a Node.

Code Sets and Code Lists

optionCode

CodeDescription
0Do not End transact.
10End transact (ET).
11End transact with retrieve (ER).
12End transact and change advice codes (ETK).
13End transact with retrieve and change advice codes (ERK).
14End transact split PNR (EF).
15Cancel the itinerary for all PNRs connected by the AXR and end transact (ETX).
16Cancel the itinerary for all PNRs connected by the AXR and end transact with retrieve (ERX).
20Ignore (IG).
21Ignore and retrieve (IR).
267Stop EOT if segment sell error.
30Show warnings at first EOT.